4006-501-510

Landscaping

Classic Case

Position:Home > Classic Case > Landscaping

Olympic Park Central Area and Olympic Forest Park

Olympic central district is a sample project with fullycoverage, modularization, intelligence, and high standard. Itcovers the area of 84.7 hectares. Collection by resin concretelinear drainage trench in square, while passing forest park,rainwater can resupply to the landscape after pre-treatment by infiltration and drainage system. There are 22.64 hectares greenbelt, 17.16 hectares infiltration pavement, 19.13 hectares without infiltration pavement, 16.47 hectares water system, 9collection pools with 7200 m³ capacity of rainwater and flood,11823 m³ adjusted store water by storage trench in the sunken garden, 60km pipeline network of infiltration and collection.There are totally 560 equipment.

HomeSponge cityCore Products CenterClassic CaseNewsService and supportSCRIAbout us