It is located in Beijing Economic and Technological Development Zone, covering a total area of 1.98 million square meters. Benz’s new factory buildings covers an area of 62,777 square meters, including the body shop, vehicle assembly section, component assembly section, technology section and administrative section. The newly increased annual production capacity is 25,000 Mercedes-Benz E-Class and C-Class cars. The project area is about 116,460m². There are installed 75 systems and 238 roof drains, of which there are 22 overflow systems.In order to meet the requirement of adjusting and reuse in the project, rainwater is collected in the pool and underground PP modular pool. Totally capacity